KHARCOAL is a high-conductivity carbonaceous Ground Enhancing Material (GEM) engineered to dramatically increase soil conductivity in challenging geographic regions where native ground resistivity is excessively high—such as rocky terrain, sand dunes, gravel, and oxide-laden soils. Applying KHARCOAL routinely slashes ground resistance readings by more than 50% compared to untreated soil.
Formulated from high-purity micro-crystalline carbon, KHARCOAL permanently solidifies into a conductive backfill when hydrated with water. It will not dissolve, leach chemicals into the groundwater, or wash away during torrential monsoons. Its chemically neutral pH is 100% non-corrosive, forming an impermeable conductive jacket that shields buried copper and copper-clad steel ground rods from chemical corrosion and galvanic degradation.
Key Technical Advantages:
Substantially reduces ground resistance (< 1-5 Ohms targets achievable even in high-resistivity earth).
Chemically stable, permanent solid matrix immune to seasonal rainwater erosion.
Non-corrosive formulation prolonging ground rod lifespan.
Maintenance-free operation requiring zero moisture replenishment post-curing.
Step-by-Step Installation Instructions
Vertical Borehole Installation:
Drill a vertical borehole with a 3-inch diameter to a depth corresponding to ground rod length minus approximately 10 cm.
Mix KHARCOAL gradually with clean water until a thick, uniform slurry paste is achieved.
Insert the copper or copper-bonded ground rod into the borehole center, driving it firmly into the borehole base.
Pour the KHARCOAL slurry around the ground rod, rodding gently to eliminate trapped air pockets until the borehole is completely filled.
Backfill the top 10 cm with native soil and bond the ground rod to the grounding ring / bare copper conductor (BC cable) via exothermically welded or high-pressure compression clamps.
Horizontal Trench Installation:
Excavate a trench 40 cm wide by 50–80 cm deep. Pour a 5 cm base layer of KHARCOAL slurry along the trench bottom.
Lay the bare copper ground conductor (BC cable or copper tape) along the slurry center.
Encapsulate the conductor with a second 5 cm top layer of KHARCOAL slurry, then backfill the trench with native soil and compact thoroughly.