Electrical Substation

HIGH & EXTRA HIGH VOLTAGE SUBSTATION WORKS (70 – 500 kV)

PT Mulya Jatra actively drives major electrical substation construction across national strategic infrastructure projects in Indonesia, serving both state utility PT PLN (Persero) and multinational industrial corporations. With a multidisciplinary engineering workforce and heavy installation tooling, we guarantee absolute schedule adherence, technical rigor, and zero-compromise safety.

Our capabilities cover complete Greenfield substation development as well as live Bay Extensions (Transformer Bays, Line Bays, Bus Couplers) for High Voltage and Extra High Voltage systems (70 kV up to 500 kV):

1. Substation Construction & Installation

  • Erection and commissioning of Power Transformers up to 800 MVA.
  • Installation of Air-Insulated Switchgear (AIS) up to 500 kV.
  • Assembly and pressurized gas testing of Gas-Insulated Switchgear (GIS / GISTET) up to 500 kV.
  • Erection of Protection & Control Panels, 20 kV Medium-Voltage Switchboards, and SCADA (RTU and SAS) networks.
  • Civil infrastructure works: heavy equipment foundation plinths, cable trenches, fire blast walls, and control buildings.

2. Preventive & Corrective Substation Maintenance

  • Transformer field MRO: on-site oil treatment, bushing cleaning, and leak sealing.
  • Switchgear and outdoor switchyard overhaul: circuit breaker timing analysis, contact resistance measurement, and disconnect switch calibration.
  • Control panel retrofitting, wiring audit, relay testing, and component upgrades.

3. Inspection, Testing & Commissioning

  • Thermographic infrared imaging identifying micro-ohm contact overheating.
  • Site Acceptance Testing (SAT) for heavy transformers and switchgear.
  • Comprehensive protection relay functional scheme testing and tripping interlocking.
  • Formal commissioning coordination for statutory certification (Rekomendasi Laik Bertegangan - RLB and Sertifikat Laik Operasi - SLO).

EXPERIENCE & DEVELOPMENT HIGHLIGHTS

Energized 500kV GITET Kediri
500kV Substation Construction
Substation Preventative Maintenance
Substation Steel Structure Assembly
High Voltage Switchyard Erection
Energized 150/20kV GIS Pudak Payung

Notable Project Commissioning Highlights:

  • Contract signing & construction: GI 150kV TR#4 Gambir Baru (HIS)
  • Contract signing & construction: GITET 500kV Kediri IBT4
  • Contract signing & construction: GI 150kV Balaraja (HIS)
  • Successful grid energization: GI 150kV Milenium
  • Successful grid energization: GISTET 500kV Kembangan
  • Successful grid energization: GIS 150kV TR3 Bintaro
  • Successful grid energization: GIS 150kV TR2-3 Kembangan
  • Successful grid energization: GITET 500/150kV Kediri IBT4
  • Successful grid energization: GIS 150/20kV Pudak Payung